Latest routes updates
19 Traseul 8
The route starts just right of the entrance in Alpiniada and ends..
The route starts just right of the entrance in Alpiniada and ends at the first belay of Moldoveanu. Loose rock in the second half. Take care with the rope drag because the line is sinuous. A 50m long rope will suffice.
11 Traseul 4
Marked at its base with figure 4. The first pitch goes upwards an..
Marked at its base with figure 4. The first pitch goes upwards and to the left along the ascending ledge and then it passes successively over two horizontal ledges. Belay on the second horizontal ledge. In the second pitch climb for 40m the inclined face partially covered with vegetation. Belay shared with the second belay from Creasta Generalului. Descent following the cable steel protected ledge to the right.
1 Veverita
The left most route. Mostly crack climbing. Free climbing difficu..
The left most route. Mostly crack climbing. Free climbing difficulty: 6c (crux in the second pitch).





Voting and comments
Please login to post comments